Ace Hardware Hartford SD

Hartford, SD

Project Details
  • Project Date: 07/09/2020
  • Location: Hartford, SD
  • Category:
Project Description

• Steel Joists: 16.1 tons
• Steel Deck (1.5B 22ga painted) 160 squares.
• Structural Steel: 14.32 tons fabricated and prime painted to consist of columns with anchor rods and epoxy, beams with connections, shear tabs with bolts for beam to precast, steel tube header beam, deck angles, joist seat angles, continuous joist bearing beam, and angle bracing.

Contractor: Jans Corporation
Engineer: Rise Structural Associates
Architect: RSArchitecture

Recent Projects